BIDDING PACKAGE 01 - VSIP IIA

General information

Supply of materials, equipment and construction of Technical Infrastructure Package 01 at VSIP II expansion - Phase 2. Implementation area 43.75 ha with 33,702 m2 of internal roads. Scope of work: Leveling the ground, construction of road and sidewalk systems, rainwater and wastewater drainage systems, electrical and telecommunication pipeline systems across the road.

Completion time 2012
Investor Vietnam – Singapore Industrial Park (VSIP) Joint Venture Company Limited
Address No. 8, Friendship Avenue, Thuan An Town, Binh Duong Province

With proven experience and capacity in the field of infrastructure construction, works and traffic systems, Nguyen Cat Investment and Construction Company Limited is honored to be trusted by the Investor - Vietnam - Singapore Industrial Park Joint Venture Company Limited to be the Design and Construction Contractor.

VSIP IIA Industrial Park owns top-notch utilities in a high-end industrial park.
VSIP 2 Industrial Park is built according to the VSIP 1 Industrial Park model, so it meets many standards. From leveling the ground, building a road and sidewalk system, a rainwater and wastewater drainage system, an electrical and telecommunication pipeline system across the wastewater treatment line to operate smoothly.

Items that Nguyen Cat Company performs:

  • Prepare the construction site to meet the construction of technical infrastructure;
  • Carry out earthworks including land preparation for the Investor's customers (cleaning the ground, leveling the ground, ...);
  • Build a road and sidewalk system;
  • Build a rainwater drainage system;
  • Construction of wastewater drainage system;
  • Construction of electric and telecommunication pipeline system across the road;
  • Supply of materials and equipment for the construction of technical infrastructure mentioned in this article; - Other related works as required by the Investor.

This is also a typical project among many projects that the contractor has signed with the Investor. The project was handed over on schedule to the Investor in 2012. The Contractor would like to express our deep gratitude and hope that the Investor will continue to trust and choose us for the next projects.