WERNER-VSIP II Factory Extension

General information

Construction of factory and warehouse with a total area of ​​7,914m2.

Construction package includes:

  • Infrastructure works such as internal roads, rainwater drainage system, wastewater, water supply system
  • Fire alarm and fire fighting system
  • Electrical system
  • Communication system
  • Office area lighting system and factory exterior lighting
  • Preparing the site for internal green space
  • Restoring existing roads and sidewalks
  • Building a guard house.
Completion time 22/05/2016
Investor Vietnam – Singapore Industrial Park Joint Venture Company Limited (VSIP)
Address No. 8, Friendship Avenue, VSIP Building, Thuan An District, Binh Duong Province

This is a project to design and construct a factory in VSIP II-A Industrial Park, Binh Duong, with Nguyen Cat Investment and Construction Company Limited as the main contractor. The investor is WERNER Company, specializing in manufacturing plastic products, manufacturing metal components, and manufacturing barrels, tanks and metal containers.

The project started in November 2015, with a floor area of ​​about 7,914m2. After 7 months of construction, the project was completed and handed over to the investor in May 2016. As a strong contractor, with experience accumulated throughout the development process and all projects handed over to the investor on schedule, Nguyen Cat Investment and Construction Company Limited has become a reliable contractor for factory investors in Binh Duong.

Strengths The Investor evaluates as a reliable Contractor:

  • Many years of experience in the field of factory construction, traffic bridges, architecture...
  • Reputable and quality construction capacity, ensuring the set schedule.
  • A team of highly qualified engineers and architects in the industry.
  • Guaranteed quality, meeting 5* standards.
  • Owning modern machinery and equipment, abundant financial capacity.

Nguyen Cat carries out factory and warehouse construction work:

  • Infrastructure works such as internal roads, rainwater drainage system, wastewater, water supply system
  • Fire alarm and fire fighting system
  • Electrical system
  • Communication system
  • Office area lighting system and factory exterior lighting
  • Preparing the site for internal green space
  • Restoring existing roads and sidewalks
  • Building a guard house.
TOP